As of October 6, 2026, 10 states have passed laws allowing plug-in solar, and more have bills moving. Most limits are 1,200 watts. Find your state below.

States where plug-in solar is law

StateStatusLawLimitStarts · key rules
ConnecticutIn effectHB 53401,200 WOctober 1, 2026 — Utility approval waived for qualifying systems.
MaineIn effectLD 17301,200 WIn effect (2026) — Systems above about 420 W need a licensed electrician; notify your utility within 30 days. References UL 3700.
MarylandIn effectHB 15321,200 WIn effect (2026) — No utility approval needed. Very small systems (about 391 W or less) are exempt from the UL certification requirement.
New HampshireIn effectSB 5401,200 WIn effect (2026) — No utility fees or prior approval; self-install allowed.
UtahIn effectHB 3401,200 WIn effect (2025) — First state law. Utilities can’t require approval or charge fees for qualifying certified systems.
VermontIn effectS. 2021,200 WJuly 1, 2026 — UL 3700 certification required; no utility fees; tenants give landlords 10 days’ notice.
VirginiaIn effectHB 3951,200 WJuly 1, 2026 (some parts Jan 1, 2027) — Renter and local-rule protections; utility notification form required.
CaliforniaPassedSB 8681,200 WJanuary 1, 2027 — Up to 1,200 W AC per home through a standard outlet; must be UL- or equivalently certified; no utility fees or permission.
ColoradoPassedHB26-10071,920 WJanuary 1, 2027 — Two tiers: about 395 W with no electrician or permit; up to 1,920 W with a licensed electrician and dedicated circuit. HOA bans blocked.
New JerseyPassedS 2368 / A 48361,200 WMarch 1, 2027 — Nationally certified equipment required, must stop exporting during outages; tenant notice rules.

"In effect" means the law's start date has passed. Some states also need a utility notice or form — follow your state's process. This is a summary, not legal advice; read the law and check with your utility before installing.

States with bills moving

StateBillWhere it stands
HawaiiSB 2902 / HB 2435Passed the Senate.
IllinoisSB 3104Advancing in the Senate.
MassachusettsH 5175 / S 3143Both chambers passed versions; in conference committee.
New YorkSUNNY Act (S 8512 / A 9111)Passed the legislature in 2026; awaiting the governor’s decision.
OklahomaHB 4060Passed a House committee.

Bills have also been introduced in Alaska, District of Columbia, Idaho, Iowa, Michigan, Minnesota, Ohio, Pennsylvania, Rhode Island, South Carolina. An introduced bill is not law.

What if my state has no plug-in solar law?

In the other 26 states, plug-in solar isn't specifically allowed yet. Your utility's normal interconnection rules apply, and they usually require approval before you connect any generating equipment to your home's wiring. Don't plug a kit in without checking with your utility first. In the meantime, a kit can still charge a portable battery that isn't connected to your home's wiring.

What the laws usually say

Sources

Compiled from Plug-In Solar US legislation roundup (Oct 4, 2026), pv magazine USA on California SB 868, pv magazine on New Jersey and UL Solutions on UL 3700. We update this page when laws change — tell us if you spot a change.

Frequently asked questions

Which states allow plug-in solar?

As of October 6, 2026: Utah, Maryland, New Hampshire, Maine, Virginia, Vermont and Connecticut have laws in effect; Colorado and California take effect January 1, 2027; New Jersey on March 1, 2027. New York's SUNNY Act awaits the governor.

What is the wattage limit for plug-in solar?

Most state laws cap plug-in systems at 1,200 watts per home. Colorado allows up to 1,920 W with a licensed electrician and dedicated circuit, and some states have lower tiers that need no electrician.

Is balcony solar legal in New York?

Not yet. The SUNNY Act passed the New York legislature in 2026 and is awaiting the governor's decision. Until it becomes law, check with your utility before connecting a kit.

Do I need permission from my utility?

In most states with a plug-in solar law, qualifying certified systems need no utility approval or fees, though some (like Maine and Virginia) require a simple notice. In states without a law, utility approval is usually required.